The 88 year old stadium received a much needed refresh. Turner Construction along with Field Control Analytics partnered together to ensure the site was secure, and the integrity of the structure and the construction team onsite maintained. Reconstruction included an new lower bowl with new stadium seating, renovated, new and increased concessions, new open air/enclosed Level 2 club area, new west suites and renovated east suites, and a new 10,000 square-foot north party deck.